PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing rebar along foundation wall and footings at column line 6.5 (G-C.7) Facing South-East (800x600).jpg Metal Decking at Derrick -3 3rd Floor Facing South-East (800x600).jpg Starting working on removing the lines at Cherry St Facing Noth (800x600).jpg Verizon Removing the lines at Cherry St (800x600).jpg Verizon truck at Cherry St (800x600).jpg Verizon Working on removing the light poles Facing East (800x600).jpg Cutting beam pockets at Stair -4 3rd floor Facing South-East (800x600).jpg Installing conduit for temporary power Facing South (800x600).jpg Installing Derrick -3 Facing West (800x600).jpg
Previous pageNext page Verizon truck at Cherry St (800x600)
Verizon truck at Cherry St (800x600)